🧱 Being able to measure directly on a 3D model (BIM) changes the way you visualize a project. You catch inconsistencies before the bid is even submitted.

CostX integrates 5D Building Information Modelling (BIM) by linking 3D design models with time and cost data. It supports:

If a measurement is updated in the 2D or 3D view, the corresponding cost item in the workbook changes automatically.

Quantities generated from drawings are linked directly to cost workbooks.